Skip to content
Drav Energy logo
• Pilot-ready

Industrial energy savings that pay for themselves

Drav Energy shows where power is wasted, tells you how to fix it, and generates PAT/BEE-ready reports. Install in under 60 minutes, prove savings in weeks.

No upfront cost for pilots • Edge reliability • Secure by default

Load
62%
Power factor
0.86
kWh today
1292

Live load trend (demo)

Power factor below 0.9 — enable capacitor bank
Steel & Foundry
Textile & Dyeing
Cold Storage
Hospitals
Auto Parts

Built for the factory floor

Everything focuses on quick wins first, then scale—MSMEs to large plants.

Actionable savings

Not just charts—clear recommendations with estimated ₹ impact.

Compliance-ready

Generate PAT/BEE-ready reports with traceable data.

Edge reliability

Local HMI and store-and-forward—no data loss during outages.

Fast install

Clip-on meters; zero-downtime installation.

Quick ROI

Find 5–10% savings fast, then expand across lines.

Sector-aware

Steel, textiles, cold storage, hospitals—tuned insights, not generic.

How it works

Simple path from first walk-through to site-wide rollout.

Walk-through

30–45 min plant visit to identify quick-win meters.

Instrument

Non-intrusive meters + gateway, no downtime.

Prove

See verified savings vs. baseline in weeks.

Scale

Roll across lines/sites once ROI is clear.

FAQ

How fast can we start a pilot?

Usually within 1 week after a site walk-through and meter availability.

Will this disrupt production?

No. Clip-on meters and gateway install with zero downtime.

Do we get a verified savings report?

Yes. We compare baseline vs. pilot period and share a concise PDF.

What about data security?

All data is encrypted in transit and at rest. Edge devices have unique keys.

Ready to see your savings?

Book a walkthrough or try the ROI estimator—no obligations.